100% Pass 2025 PRINCE2 PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam First-grade Valid Study Notes
100% Pass 2025 PRINCE2 PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam First-grade Valid Study Notes
Blog Article
Tags: PRINCE2-Agile-Practitioner Valid Study Notes, PRINCE2-Agile-Practitioner New Dumps Ppt, Reliable PRINCE2-Agile-Practitioner Exam Pdf, PRINCE2-Agile-Practitioner Valid Exam Topics, Reliable PRINCE2-Agile-Practitioner Braindumps Book
Whether you are a student at school or a busy employee at the company even a busy housewife, if you want to improve or prove yourself, as long as you use our PRINCE2-Agile-Practitioner guide materials, you will find how easy it is to pass the PRINCE2-Agile-Practitioner Exam and it only will take you a couple of hours to obtain the certification. With our PRINCE2-Agile-Practitioner study questions for 20 to 30 hours, and you will be ready to sit for your coming exam and pass it without difficulty.
The learners' learning conditions are varied and many of them may have no access to the internet to learn our PRINCE2-Agile-Practitioner study question. If the learners leave home or their companies they can't link the internet to learn our PRINCE2-Agile-Practitioner test pdf. But you use our APP online version you can learn offline. If only you use the PRINCE2-Agile-Practitioner study question in the environment of being online for the first time you can use them offline later. So it will be very convenient for every learner because they won't worry about anywhere to learn our PRINCE2-Agile-Practitioner exam practice materials.
>> PRINCE2-Agile-Practitioner Valid Study Notes <<
PRINCE2-Agile-Practitioner New Dumps Ppt, Reliable PRINCE2-Agile-Practitioner Exam Pdf
2Pass4sure PRINCE2 PRINCE2-Agile-Practitioner Exam Questions And Answers provide you test preparation information with everything you need. About PRINCE2 PRINCE2-Agile-Practitioner exam, you can find these questions from different web sites or books, but the key is logical and connected. Our questions and answers will not only allow you effortlessly through the exam first time, but also can save your valuable time.
PRINCE2 Agile Practitioner Project Management Exam Sample Questions (Q25-Q30):
NEW QUESTION # 25
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional information, answer the following question:
The senior user has specified a second charity to which any proceeds should be donated. All marketing material to be used from now onwards must promote the new charity. Banners promoting only the first charity have already been produced, delivered and approved in a previous timebox. The effort to add the new logo to the existing banners is low.
How should the Marketing Team respond to this change with respect to the banners already created?
- A. Address it when planning and prioritizing the work in the current or next timebox.
- B. Treat it as an item NOT meeting the specification which the banner supplier should rectify.
- C. Handle it at the detailed level using the quality criteria in the product description for the banner.
- D. Escalate it to the project board as a request to change the detail of an existing product.
Answer: A
Explanation:
Since the effort to add the new logo is low, it is efficient to incorporate this change during the planning and prioritization of tasks for the current or next timebox. This allows the team to adapt to the new requirement without needing to escalate or disrupt the project flow significantly.
NEW QUESTION # 26
Which BEST describes an agile method or approach that can be integrated with PRINCE2 Agile?
- A. Reducing quality testing in order to deliver within agreed deadlines.
- B. Favoring processes and tools over individuals and interactions.
- C. Encouraging system improvement through visualization and controlling work in progress.
- D. Providing guidance on tailoring any applicable principles, themes and processes.
Answer: C
Explanation:
This approach aligns with Agile principles, emphasizing continuous improvement and effective workflow management, which can complement the structured framework of PRINCE2 Agile.
NEW QUESTION # 27
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Staff Training - Additional information
The event will be supervised primarily by LGA staff volunteers. They will need to be trained in various skills so that:
- A. It is a good approach because a design should be an interim stage of the Event Village work package.
- B. the event is carried out safely and professionally;
- C. It is a poor approach because releases need to be put into operational use to receive any feedback.
- D. staff members are able to give advice on health and fitness.
This is covered by four work packages:
1. Training syllabus:
* High-level design of the manual.
* Content of each module.
2. Course content for safety and professionalism:
* Detailed design of two modules:
* Health and Safety including basic first aid.
* Customer relations to look after people attending the event.
* Piloting the modules with a group of volunteers.
3. Course content tor giving advice on health and fitness:
* Detailed design of two modules:
* Exercise fundamentals including how to warm up and cool down.
* Healthy eating including what types of food are good for you.
* Piloting the modules with a group of volunteers.
4. Training delivery:
* Production of the training manual;
* Delivery of the training to the rest of the volunteers.
The Staff Training Team is staffed by in-house training staff members that have been involved in several waterfall projects but have not had any exposure to agile.
Using the Project Scenario and Staff Training Additional information, answer the following question:
The safety and professionalism course content timebox includes three high-level requirements.
During timebox planning, it was identified that it will not be possible to deliver everything relating to all three of these requirements during the timebox.
What is the effect of setting the time tolerance to zero for the timebox? - E. It is a poor approach because visiting the site of the Event Village is NOT classed as a sub-product.
- F. It is a good approach because a physical representation will deliver something of use to the project.
Answer: B
Explanation:
Setting the time tolerance to zero means that the team cannot exceed the planned duration of the timebox.
This necessitates a focus on prioritizing the requirements to ensure that the most critical aspects can be delivered within the allocated time. Decomposing the high-level requirements helps identify which elements are essential and can be achieved in the time available.
NEW QUESTION # 28
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional Information, answer the following question:
For which marketing product would a quality method of automated test-driven development be MOST suited?
- A. The radio interview.
- B. The banners for the Event Village.
- C. The text and links for the website.
- D. The newspaper advertisements.
Answer: C
Explanation:
Automated test-driven development (TDD) is particularly well-suited for digital products like website content, where code and links can be continuously tested for functionality and correctness. This approach allows for rapid iterations and ensures that updates do not introduce errors, making it ideal for maintaining the quality of web content.
NEW QUESTION # 29
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Staff Training - Additional information
The event will be supervised primarily by LGA staff volunteers. They will need to be trained in various skills so that:
- A. It applies the target poorly because the CSME should have been added during Stage 2 to improve progress.
- B. the event is carried out safely and professionally;
- C. It applies the target poorly because the LGA will NOT have access to the health and safety expert during Stage 3.
- D. It applies the target well because the relevant skills should be available for each timebox.
- E. staff members are able to give advice on health and fitness.
This is covered by four work packages:
1. Training syllabus:
* High-level design of the manual.
* Content of each module.
2. Course content for safety and professionalism:
* Detailed design of two modules:
* Health and Safety including basic first aid.
* Customer relations to look after people attending the event.
* Piloting the modules with a group of volunteers.
3. Course content tor giving advice on health and fitness:
* Detailed design of two modules:
* Exercise fundamentals including how to warm up and cool down.
* Healthy eating including what types of food are good for you.
* Piloting the modules with a group of volunteers.
4. Training delivery:
* Production of the training manual;
* Delivery of the training to the rest of the volunteers.
The Staff Training Team is staffed by in-house training staff members that have been involved in several waterfall projects but have not had any exposure to agile.
Using the Project Scenario and Staff Training Additional information, answer the following question:
The Staff Training team manager made a request for an additional full-time customer subject matter expert (CSME) to be allocated to the Staff Training Team for the next timebox, which is in Stage 3.
This person is responsible for health and safety training within the LGA.
What BEST explains why this approach complies with the 'keep teams stable' target? - F. It applies the target well because the team manager should remove obstacles to delivery.
Answer: E
Explanation:
By requesting an additional full-time customer subject matter expert (CSME) for the next timebox, the team manager ensures that the necessary expertise is available to the Staff Training Team. This stability in skills and resources helps the team maintain continuity in their work and increases the likelihood of successful delivery, aligning with the principle of keeping teams stable.
NEW QUESTION # 30
......
Compared with the other products in the market, our PRINCE2-Agile-Practitioner latest questions grasp of the core knowledge and key point of the real exam, the targeted and efficient PRINCE2 Agile Practitioner Project Management Exam study training dumps guarantee our candidates to pass the test easily. Passing exam won’t be a problem anymore as long as you are familiar with our PRINCE2-Agile-Practitioner Exam Material (only about 20 to 30 hours practice). High accuracy and high quality are the reasons why you should choose us.
PRINCE2-Agile-Practitioner New Dumps Ppt: https://www.2pass4sure.com/PRINCE2-Agile/PRINCE2-Agile-Practitioner-actual-exam-braindumps.html
At the same time, our PRINCE2-Agile-Practitioner test torrent can help you avoid falling into rote learning habits, Time and Time again I have noticed every individual wants to prepare PRINCE2-Agile-Practitioner exam but they don't have an idea which platform they have to choose for the preparation of PRINCE2-Agile-Practitioner exam, Free renewal of our PRINCE2-Agile-Practitioner study prep in this respect is undoubtedly a large shining point, PRINCE2 PRINCE2-Agile-Practitioner Valid Study Notes As we all know, procedure may be more accurate than manpower.
The substance also fills the air gaps between the mating surfaces of two items PRINCE2-Agile-Practitioner that are in contact, making the surface area of the contact larger and also keeping out oxygen and other contaminants that can corrode the contact point.
Valid PRINCE2-Agile-Practitioner exam materials offer you accurate preparation dumps - 2Pass4sure
Understanding Mail, Contacts, Calendars behavior, At the same time, our PRINCE2-Agile-Practitioner Test Torrent can help you avoid falling into rote learning habits, Time and Time again I have noticed every individual wants to prepare PRINCE2-Agile-Practitioner exam but they don't have an idea which platform they have to choose for the preparation of PRINCE2-Agile-Practitioner exam.
Free renewal of our PRINCE2-Agile-Practitioner study prep in this respect is undoubtedly a large shining point, As we all know, procedure may be more accurate than manpower, I can assure you that you will pass the PRINCE2-Agile-Practitioner exam as well as getting the related certification under the guidance of our PRINCE2-Agile-Practitioner training materials as easy as pie.
- New PRINCE2-Agile-Practitioner Exam Answers ???? PRINCE2-Agile-Practitioner Exam Dumps ???? Free PRINCE2-Agile-Practitioner Practice ???? Search for ➽ PRINCE2-Agile-Practitioner ???? and obtain a free download on ➠ www.exams4collection.com ???? ????PRINCE2-Agile-Practitioner Authorized Exam Dumps
- PRINCE2-Agile-Practitioner PDF Questions [2025]-Right Preparation Material ???? Easily obtain 《 PRINCE2-Agile-Practitioner 》 for free download through ⏩ www.pdfvce.com ⏪ ⏭PRINCE2-Agile-Practitioner Current Exam Content
- PRINCE2-Agile-Practitioner Valid Test Answers ???? Latest PRINCE2-Agile-Practitioner Test Testking ???? PRINCE2-Agile-Practitioner Current Exam Content ???? Search for 「 PRINCE2-Agile-Practitioner 」 and download it for free on ➽ www.torrentvce.com ???? website ↪PRINCE2-Agile-Practitioner Pass Test Guide
- PRINCE2-Agile-Practitioner PDF Questions [2025]-Right Preparation Material ???? Search for ⇛ PRINCE2-Agile-Practitioner ⇚ and download it for free immediately on ✔ www.pdfvce.com ️✔️ ????Dumps PRINCE2-Agile-Practitioner Collection
- Exam PRINCE2-Agile-Practitioner Prep ???? PRINCE2-Agile-Practitioner Reliable Test Question ???? PRINCE2-Agile-Practitioner Valid Test Blueprint ???? ⇛ www.examsreviews.com ⇚ is best website to obtain ➠ PRINCE2-Agile-Practitioner ???? for free download ????PRINCE2-Agile-Practitioner Current Exam Content
- PRINCE2-Agile-Practitioner Exam Dumps ✳ PRINCE2-Agile-Practitioner Exam Dumps ???? Free PRINCE2-Agile-Practitioner Practice ???? Download ➠ PRINCE2-Agile-Practitioner ???? for free by simply searching on ☀ www.pdfvce.com ️☀️ ????Exam PRINCE2-Agile-Practitioner Prep
- Free PDF Quiz PRINCE2-Agile-Practitioner - PRINCE2 Agile Practitioner Project Management Exam –Reliable Valid Study Notes ???? Open ▶ www.pdfdumps.com ◀ enter 【 PRINCE2-Agile-Practitioner 】 and obtain a free download ????Dumps PRINCE2-Agile-Practitioner Collection
- Latest PRINCE2-Agile-Practitioner Dumps Ppt ✉ Dumps PRINCE2-Agile-Practitioner Collection ???? PRINCE2-Agile-Practitioner Current Exam Content ???? Go to website “ www.pdfvce.com ” open and search for ➥ PRINCE2-Agile-Practitioner ???? to download for free ⛄PRINCE2-Agile-Practitioner Valid Test Answers
- Free PDF PRINCE2 Marvelous PRINCE2-Agile-Practitioner Valid Study Notes ???? Search for ➠ PRINCE2-Agile-Practitioner ???? and easily obtain a free download on ➥ www.actual4labs.com ???? ????Dumps PRINCE2-Agile-Practitioner Collection
- Quiz 2025 Accurate PRINCE2 PRINCE2-Agile-Practitioner Valid Study Notes ???? Easily obtain ➤ PRINCE2-Agile-Practitioner ⮘ for free download through ➡ www.pdfvce.com ️⬅️ ????Customized PRINCE2-Agile-Practitioner Lab Simulation
- PRINCE2-Agile-Practitioner Current Exam Content ???? Customized PRINCE2-Agile-Practitioner Lab Simulation ???? PRINCE2-Agile-Practitioner Reliable Test Question ???? Open 「 www.free4dump.com 」 and search for ( PRINCE2-Agile-Practitioner ) to download exam materials for free ????Customized PRINCE2-Agile-Practitioner Lab Simulation
- PRINCE2-Agile-Practitioner Exam Questions
- bbs.hzshw.com xn--cksr0a682dnnjxvp.xn--kbto70f.com dataclick.in www.mvw168.cn learning.aquaventurewhitetip.com rupeebazar.com kpphysics.com tadika.israk.my tutorialbangla.com www.mukalee.com